CONCRETE OVERLAY

Existing Channel Invert Overlay

Existing channel bottom was damaged due to "scour", exposing reinforcing steel in multiple locations.

Sika 224 spray applied mortar was used to protect and rebuild.

Green pipes are to carry away diverted water captured upstream.

Total length of overlay was greater than 1000' feet.

40,000 psi water blasting was used toprepare surfaces

CONTACT US

keep in touch